King Kutter phd-09s Uživatelský manuál

Procházejte online nebo si stáhněte Uživatelský manuál pro ne King Kutter phd-09s. King Kutter phd-09s User's Manual Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 20
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
POST HOLE DIGGERS
PHD-06S, PHD-09S, PHD-12S
PO Box 1200
305 Commerce Drive
Winfield, Alabama 35594
www.kingkutter.com
Zobrazit stránku 0
1 2 3 4 5 6 ... 19 20

Shrnutí obsahu

Strany 1 - PHD-06S, PHD-09S, PHD-12S

POST HOLE DIGGERSPHD-06S, PHD-09S, PHD-12SPO Box 1200305 Commerce DriveWinfield, Alabama 35594www.kingkutter.com

Strany 2

ASSEMBLY INSTRUCTIONS1. Attach arch to lower hitch points. If tractor has Category 2 hitch, usebushings provided on arch pins.2. Attach arch to boom w

Strany 3 - Customer Information

OPERATING INSTRUCTIONS1. Lower auger point slowly to ground. Auger point should be about 4” to the rearof the plumb line of the center of the top of t

Strany 4

SAFETY TRAININGz Safety is a primary concern in the design and manufacture of our product.Unfortunately, our efforts to provide safe equipment can be

Strany 5 - CONTENTS

PREPARTIONz Never operate the tractor and post hole digger until you have read and completely under-stand this manual, the Tractor Operator’s Manual,

Strany 6 - YOUR SAFTEY IS INVOLVED

OPERATIONAL SAFETYz The use of this equipment is subject to certain hazards that cannot beprotected against by the mechanical means or product design.

Strany 7 - EQUIPMENT SAFETY GUIDELINES

OPERATIONAL SAFETY continued...z Never allow the auger to contact such items. Never assume an area isclear. Always Check!z Always stop the tractor,

Strany 8

OPERATIONAL SAFETY continued...z Always check tractor manual for proper use on slopes.z When using a unit, a minimum 20% of tractor and equipment weig

Strany 9

Ref.No.Part Name1473001 Complete Collar Yoke2 Cross Journal Set900270900271900272900273Complete Special Yoke3PHD-S PTO 147300174Complete PTO Shield

Strany 11 - LUBRICATION SCHEDULE

Ref.No.Part NamePart Number1 Boom Complete 9002532910141516Lynch PinPin w/Cotter PInsArch CompleteBushing (2 REQ)Shear Bolt Pkg. (3/8” X 2-1/2” Grade

Strany 13 - STARTING AND STOPPING SAFETY

1. Limited Warranty.King Kutter, Inc. (“King Kutter”), P.O. Box 1200, Winfield, Alabama 35594, warrants to the original retailpurchaser (“Purchaser”)

Strany 14

3TO THE PURCHASERThis manual contains valuable information about yournew King Kutter Post Hole Digger. It has been carefully pre-pared to give you hel

Strany 15

4It is the purchaser and/or operator’s responsibility to….zzzzz Read and understand the information contained inthis manual.zzzzz Operate, lubricate,

Strany 16

5CONTENTSITEM PAGESafety ...6Safety Decal's And Locations...

Strany 17 - PHD-S PTO 147300

6SIGNAL WORDS:The signal words DANGER, WARNING and CAUTION are used with thesafety messages in this manual and with each safety signs. They aredefine

Strany 18 - Post Hole Digger

7EQUIPMENT SAFETY GUIDELINESz Safety of the operator and by standards is one of the main concerns in designing anddeveloping a digger. However, every

Komentáře k této Příručce

Žádné komentáře